GEN2 Garrett GTX3076R Turbo - .63 A/R T4 Turbine Hsg. w/ GT 3" V-Band (conical exit 81mm lip) GRT-TBO-800

Price
$2,415.34

PRODUCT DESCRIPTION:

Garrett GEN2 GTX3076R dual ball bearing turbocharger with a .63 A/R T4 Inlet GT 3" V-Band (conical exit - 81mm lip) Turbine Housing. Advanced GEN2 billet compressor wheel capable of 750HP!

Garrett's fastest spooling "T4 frame" 700HP+ GEN2 GTX turbo!!

PRODUCT FEATURES:

  • Advanced aerodynamics & ultra high flow Garrett GTX GEN2 compressor wheel
  • Forged billet aluminum compressor wheel
  • Dual ball bearing CHRA rotating assembly


  • PRODUCT SPECIFICATIONS:
  • Compressor Wheel Inducer: 58mm
  • Compressor Wheel Exducer: 76mm
  • Compressor Wheel Trim: 58
  • Compressor Housing: 0.60 A/R T04E, 4" Ported Shroud (anti-surge) Inlet and 2" Outlet
  • Turbine Wheel Inducer: 60mm
  • Turbine Wheel Exducer: 55mm
  • Turbine Wheel Trim: 84
  • Turbine Housing: .63 A/R T4 Undivided Inlet and GT 3" V-Band Outlet (conical exit - 81mm lip)
  •  

    INSTALLATION HARDWARE: 

  • Coolant - Water Options (*Please call for assistance*)
  • Oil feed fitting with .035" restrictor: OIL-021
  • Oil drain flange: FLA-010
  • Oil drain gasket: GSK-008
  • 8mm x 1.25 (thread pitch) Stud: FST-030
  • 8mm x 1.25 (thread pitch) Locking Head Nut: FST-031

  • T4 Inlet Flange (for Turbo Manifold): FLS-200
  • T4 Inlet Gasket: GSK-006
  • V-Band "GT" 3 Inch Outlet Flange (for Downpipe): FLS-246
  • V-Band Outlet Clamp: CLA-048
  •  


    NOTE: Alternate coolant and oil fittings and flanges are available.



    COMPRESSOR & TURBINE MAPS:
     

     

     


    Shipping Information

    Our on-line store is open 24/7 and we ship Monday through Friday, excluding some holidays. Orders received for products without shipping restrictions on its product page will ship the same business day when received before 12:00 p.m. PST. Orders in high demand will have an estimated production time listed on its product page and will ship according to the date listed.

    **ALL TURBO KITS ARE BUILT TO ORDER** 4-6 WEEK LEAD TIME.

    **ALL FUEL KITS ARE BUILT TO ORDER** 2-3 WEEK LEAD TIME

    You may also like